Job vacancy Consultancy (Design And Construction Supervision Of Public Toilet Blocks And School Toilet Facilities For Small Towns )

JOB BY
JobsinGhana
59 Okodan St, Blue Gate district, Osu, Accra near Papaye, Accra
  +233 0302 760143, +233 24 3925110

View all 753 Jobs
Job Type
Employee
Job Status
Full Time
Announced
27 September, 2020
Job Title

Consultancy (Design And Construction Supervision Of Public Toilet Blocks And School Toilet Facilities For Small Towns )

Job Location
Job Presentation
Company Profile

Water & Sanitation for the Urban Poor (WSUP) is a not-for-profit company that helps transform cities to benefit the millions who lack access to water and sanitation. WSUP’s vision, in line with the Sustainable Development Goals (SDGs), is of a world in which all urban dwellers, including the poorest, enjoy affordable, high-quality water and sanitation services. This will generate massive gains in human well-being, in national economic growth and in global environmental sustainability. WSUP has a strategic portfolio of six focus countries in Africa and South Asia (Bangladesh, Ghana, Kenya, Madagascar, Mozambique, Zambia), where it works in close partnership with local service providers and national government. WSUP also works globally through its consultancy arm WSUP Advisory.Within its six focus countries and globally, WSUP works towards its vision through activities in five Strategic Areas: 1) delivering services and testing models; 2) developing capacity in the public and private sectors; 3) influencing and providing technical assistance; 4) mobilising resources for the WASH sector; and 5) carrying out research and producing evidence. As illustrated in the Theory of Change below, all of WSUP’s activities are focused towards the end goal of sector functionality, on the view that  sustainable change will not be achieved by donor-funded construction of “taps and toilets”, but rather by coordinated efforts to build functional city-level and national systems for urban WASH services delivery. WSUP believes that the development of such systems depends fundamentally on two things: 1) the transformative power of markets and innovation, and 2) deep political commitment and institutional change. WSUP works to drive change in both spheres.For more information about WSUP's vision and approach, see www.wsup.com.


TERMS OF REFERENCE PROVISION OF CONSULTANCY SERVICES FOR DESIGN AND CONSTRUCTIONSUPERVISION OF PUBLIC TOILET BLOCKS AND SCHOOL TOILET FACILITIES FOR SMALL TOWNS IN ASHANTI REGION  Background for the consultancySustainability remains a challenge for sanitation service delivery in small towns in Ghana resulting in non-functionality and poor service delivery of many of the public and school toilet blocks as a result of poor operation and management practices and facility design challenges.A feasibility study which was undertaken for a project to catalyse systemic change through the provision of sustainable water services in small towns of Ashanti region-Ghana revealed that the target beneficiary community for the project are in dire need of improvements in sanitation both at the community and school environments. The communities have inadequate public, school and household toilet facilities; a situation which leads to the practice of open defecation in and around the communities. The few existing community and school toilets are in a poor state exposing users to faecal matter, emitting foul odours and are insecure, especially for women and school children as the available toilets lack privacy and security. The target areas for the proposed intervention are the cocoa-growing communities of Offinso Koforidua and Okaikrom for the construction of public toilet blocks with an estimated total population of 6,979 and basic schools in New Koforidua and Petransa for the construction of school toilet facilities with an estimated total population of 1,538 WSUP, with funding from One Foundation, and in collaboration with respective Metropolitan Municipal District Assemblies (MMDAs) is implementing a project, entitled “Improved WASH for COVID-19 Resilience in Small Towns of Ashanti Region, Ghana”. The project’s objective is to promote sustainable access to safe and improved sanitation and hygiene promotion in 4 small towns of Ashanti region. This will be done through the construction of 2 no. WC public toilet blocks with mechanized water supply system run under financially sustainable management models in two (2) beneficiary communities (Offinso Koforidua and Okaikrom) and construction of 2no.WC school toilet facilities with mechanized water supply system and operates under effective and sustainable facility management plan in two (2) beneficiary community basic schools (Presby basic school in New Koforidua and SDA basic school in Petransa).  We intend to systemically evolve the effectiveness of the management models and facility management plans used to deliver hygiene and sanitation services under the project, and to disseminate the learning gained.  WSUP has undertaken similar projects in the past and there are designs and reports available from these previous works to There is therefore the need for review of the engineering designs for public toilet blocks and the design of school toilet facilities, support tender process for selection of contractor(s) and supervision of works to ensure the construction and operations of the WC public toilet blocks in the communities and schools The services of a consultant are required to deliver the project objectives.  ObjectivesThe overall objective of the project is to build community resilience, in response to COVID-19 pandemic, through improved sanitation and good hygiene practices in targeted small towns of Ashanti Region. We will do this through the construction of user-friendly, safe public toilet blocks and school WASH facilities. This will be  accompanied by co-creation of appropriate operations and management models to sustainably run the public and school toilet facilities. The project further aims to reinforce COVID-19 preventive messaging, including the importance of hand washing and social and physical distancing.  The specific objectives of the assignment are:

  • Conduct technical feasibility studies, which include technical viability and sustainability, environmental impact and financial feasibility assessment of each proposed facility in each school and community. The studies should take into account the technical and managerial capabilities of the proposed operators and managers particularly in terms of operation and maintenance. 
  • Carry out demand analysis and estimate the future (10 and 25 years) sanitation needs of the proposed beneficiary schools and communities.
  • Carry out hydrological investigations, including use of existing data as well as field work, to ensure that the selected sanitation sites for construction should provide all year round adequate water yield to the toilet blocks. Rainwater harvesting calculations must also be part of the feasibility study.
  • Develop a standard design for school facilities that can be used for the two target schools with simple alternations for each site that is environmentally friendly. And also considers the use of rainwater harvesting. Incorporate design principles of low cost operations and maintenance and ease of operations using automation and on line monitoring where possible. 
  • Review similar existing designs for public toilet blocks and prepare detailed engineering designs, drawings and bidding documents for the proposed facilities to include rain harvesting facilities to supplement supplies.
  • Identify appropriate sites in collaboration with all stakeholders and support the project in the acquisition of environmental building permits and other necessary statutory permits required for the project implementation.  
  • Provide technical services in the procurement of civil works contractors to carry out the construction phase of the project and undertake effective supervision of contractors.
  • Collaborate with all stakeholders, including MMDAs, GES and CWSA as well as other relevant utility agencies to ensure compliance with prevailing standards, guidelines and regulations.
  • Promote community interest and participation in the programme through provision of appropriate information to the communities.
  • Based on CWSA and GES guidelines facilitate the selection and approval of community and school management team members in all the 4 beneficiary communities.
  • Develop a comprehensive public toilet operations and maintenance training manual and school toilet facility management plan to serve as a guide for the training of all community and school management team members in all 4 communities.
  • Scope of work and overall approachThe consultancy service will cover the detailed engineering designs with bill of quantities for two (2) proposed 20 seater WC public toilet blocks located in two (2) communities and two (2) proposed WASH facilities (toilet and water and hand washing systems) in two (2) schools in Ashanti Region of Ghana as listed above in table 1.1. The consultant is also expected to develop comprehensive bid documents based on the approved designs, facilitate the procurement process leading to the selection of contractors and provide the supervision of works to deliver the sanitation facilities to project beneficiary communities and schools. The designs shall be done in accordance with CWSA, MMDAs and GES guidelines with the following additions and modifications.
  • Provide adequate storage for continuous supply of water 
  • Cubicle distribution ratio, male : female should be 2 : 3
  • The facility should be disability user friendly
  • 80% of the cubicles should be squatting.
  • Integrated and daily use of rain harvesting facilities at the storage points should also be considered.
  • General Consideration for School ToiletsFacilities provided must have appropriate dimensions and features for young children and address gender needs especially of adolescent girls. Facilities must encourage hygienic behaviour in children as agents of change for their families and their communities. Facilities provided are adequate and meet the needs of all pupils irrespective of age, gender or physical disability and are appropriately located to ensure security, provide privacy and be environmentally friendly. Other Things to be considered in the design of school toilets:
  • A maximum of 50 pupils will use one drop hole/toilet cubicle.
  • Separate blocks will be provided for boys and girls toilets.
  • Provision of urinals for each for boys and girls.
  • Water for hand washing will be available within each toilet facility.
  • Changing room for adolescent girls will be provided in each toilet block for       girls. Changing rooms will have (running) water, mirrors and hooks in the walls for hanging apparel and a disposal chamber to dispose of used sanitary items
  • Toilets for children will be appropriately sized to ensure the children are comfortable and feel safe in the use of the toilet. Foot rests for squatting units will be appropriately sized and positioned for age and sex.
  • Toilet cubicle doors will have bolts and be boltable from inside.
  • Toilets should be located at reasonable distances to the school buildings for ease of access by children, especially the younger ones while still meeting the privacy demands and protecting children against violence.
  • Toilets will be hygienic to use and easy to clean and will have a cleaning and        maintenance schedule in place.
  • Provision of separate standpipe with tap away from the schools to provide access to water. Borehole siting should ensure adequate distance from the toilet sub structure to avoid contamination.
  • The scope of work for the consultancy service is detailed in the tasks below;  Task 1: Preliminary Report  The consultant will present an inception report to the client within 30 calendar days of the contract signing. The report shall detail the understanding of the assignment, proposed methodology (data collection, analysis process and tools and engagement of stakeholders), team composition with clear roles and responsibilities and the plan of action for accomplishing the task. The inception report should also provide summarized preliminary findings based on the following tasks:
  • A review of key project documents
  • A review of previous WSUP documents relevant to this work, including O&M manuals and training materials developed for other sites
  • A review of previous documented evaluations of WSUP sanitation projects 
  • A reconnaissance survey of the proposed communities to provide the data required to assess the communities against the objectives given above.
  • All necessary studies or investigations, including geotechnical and hydrological investigations, spatial planning, architectural, structural and services design; borehole siting, public and school toilet block design and land surveying, 
  • Review report on the existing public and school toilet designs. 
  • Review good practice on providing menstrual hygiene management, and make recommendations to be incorporated into design  
  • Review good practice on providing sanitation access for people with reduced mobility or other physical disability, and make recommendations to be incorporated into design   
  • Provide technical feasibility report for each town and school including data on:  
  • Appropriateness of the proposed sanitation site for construction
  • Feasibility report with standard design options
  • Feedback from the stakeholders on design proposals
  • To undertake this activity, the consultant shall obtain all relevant documents from WSUP, CWSA, GES and the District Assemblies. The consultant shall also conduct field visits to all the 4 proposed communities. The consultant shall produce an inception report to WSUP and key project stakeholders for review, 30 calendar days after commencement of the assignment. Task 2: Preparation of designs and O&M Manual  The consultant shall carry out the following activities under task 2.
  • Prepare detailed engineering designs to be reviewed and approved by WSUP and all project stakeholders for the construction of 20 chamber WC public toilet blocks and school WASH facilities in four (4) communities.
  • Preparation of drawings of layouts, designs of public and school toilet blocks and ancillary works which will include septic tank and soak away, office and store room for vendors, rails and entry space for vulnerable and disability and rain harvesting facilities.
  • Production of detailed bill of quantities and specifications for each design (hard and soft copies). The soft copies of the Bill of Quantities shall be in MS Excel.
  • Organize a series of community and district stakeholder review of the respective designs, drawings and layouts for comments and inputs.
  • Prepare a financial model that details revenue projection and O&M costs over a 5-year period to establish if revenues generated will be adequate for O&M of the facility.
  • Prepare O&M manual and facility management plan for the operations and maintenance of the facilities.
  • Task 3: Prepare and Lead Tendering Process The Consultant shall carry out the following activities under task 3
  • Prepare all tender documents.
  • Group the bid documents in lots of at least two (2) based on the type of approved designs for public toilets and school WASH facilities.
  • Facilitate the procurement of contractors in collaboration with key project stakeholders.
  • An evaluation report of tenders received will be submitted to WSUP for review and approval.
  • Task 4: Construction Supervision  This task involves the following activities:
  • The award of contracts for the construction of the works for each school and community:
  • Handing over of the site to the contractors
  • Preparation and submission of construction inception report
  • Supervising the contractors throughout the construction process to ensure that all requirements and specifications are complied with.
  • Organize and preside over site meetings, provide site meeting minutes to WSUP 
  • Provide WSUP and stakeholders with a monthly report on the detailed progress of work specifying any current issues and risks to completion on time and within budget 
  • Assess construction work, agree corrections where necessary and certify contractors’ payment requests on work done
  • Issue any variation orders to the contractor within the requirements and specifications of the contract.
  • Manage and supervise all contractors to deliver the public and school toilet facilities according to the approved designs, layouts and specifications.
  • Conduct post construction technical inspection and test running of facilities.
  • Ensure that fully completed and functional public and school toilet facilities are handed over to the project stakeholders and the beneficiary communities.
  • Prepare and submit a final report 
  • Task 5: Conduct O & M Training
  • Facilitate the selection of community and school management committees (CMCs) according to CWSA and SHEP guidelines
  • Develop standard operating procedures (SOPs) with operators of community toilets
  • Develop a comprehensive school WASH facility management plan.
  • Review existing training manual and facility management plans and produce a comprehensive training manual for school and community toilet facilities
  • Conduct O & M training for school authorities and selected school children.
  • Facilitate user education of the school facilities for the school pupils and teachers.
  • Produce final training report, training manual, facility management plan and financial model that details revenue projections for the community toilet facilities over a period of 5 years.
  • Summary of OutputsDesign and delivery of 20 cubicle WC public toilet block and school WASH facilities, drawings, layouts, septic tank, storage, rain harvesting facilities. A detailed engineering designs, cost estimates, bill of quantities for tender and specifications are produced for the sanitation facilities to be constructed. All documents should be in Word format, all tables of quantities and costs should also be in Excel format and PDF versions of designs and layouts. Dwg versions of designs should also be submitted. The total number of input days required for this task is 160 working days  Table 2: Schedule of deliverables1. Feasibility report with hydrological studies, ware resource report and demand model with appropriate standard designs.  Feedback from stakeholders on proposals
    Requirements
    • Education: Qualified
    Valid Till
    14 Oct, 2020


    Apply for this Job

    Unfortunately this job vacancy expired.

    More Job Vacancies


    See all jobs
    BACK TO TOP